About This Project

August Electronics

Specs

6743 9th Street NE, Calgary AB

Office: 3,850 sq ft +/- Warehouse: 21,750 sq ft +/-

Total area: 25,600 sq ft

Overview

A brief overview of the work completed in the space:

  • Demolition of existing office and warehouse. Complete re-design and build-out of office and warehouse to accommodate August Electronics specific requirements
  • Warehouse floor preparation and application of approx. 20,000 sq ft  of Electrostatic-Dissipative Epoxy Floor coating
  • Air Lines – Main runs at roof deck with 1” black steel pipe with rubber hose drops to predetermined workstations
  • Custom pack poles systems to accommodate airline drops
  • Warehouse ventilation to accommodate general use operations – 4,000 CFM
  • Removal of warehouse lighting and replacement of T5HO light fixtures
  • Installation of Dura-Ramp portable exterior building loading dock and handrails – approximately 30,000 lbs. capacity

References

Peter Wilson (403) 273-3131

 

Category
Industrial